The first project 3 years ago was to create a new master bedroom and bath. We began by demolishing the entire interior space. There is a beautiful master bath with a steam shower, free standing tub and double sink. All the windows were replaced, a dormer in the master, cathedral ceiling, radiant heat floors over oak plank flooring.